London:
Highway 401 eastbound will have a moving lane closure in the median lane from Highway 4 (Interchange 177) to Highway 19 (Interchange 219) on Tuesday, May 14, 2013 from 0800 hours to 1430 hours for a sweeping operation.
Highway 401 in both directions between Highbury Avenue (Interchange 189) and Wellington Road (Interchange 186) will have the driving lane and right shoulder closed for construction operations. The westbound lane will be closed on Tuesday, May 14, 2013 from 0700 hours to 1800 hours. The eastbound lane will be closed on Wednesday, May 15, 2013 from 0700 hours to 1800 hours.
London-Kitchener: Highway 401 in both directions from Highway 4 (Interchange 177) to Homer Watson Boulevard (Interchange 275) will have alternating lane closures starting at 0900 hours to 1700 hours on Tuesday, May 14, 2013 for line painting operations.
Chatham-London:
Highway 401 in both directions at various intersections from Interchange 90 (Chatham) to Interchange 177 (St. Thomas) will have the median lanes and ramps closed on Tuesday, May 14, 2013 between 0900 hours to 1800 hours for mobile line painting operations. The westbound lane will have mobile closures from 0900 hours to 1300 hours and the eastbound lane will have mobile closures from 1300 hours to 1800 hours.
Strathroy:
Highway 402 eastbound at Hickory Drive (Interchange 69) will have an alternating lane closure and the on ramp closed on Tuesday, May 14, 2013 from -0800 hours to 2000 hours for a bridge condition survey operation. One lane will be open at all times.
Brantford:
Highway 403 eastbound at the CN Overpass between Wayne Gretzky Parkway (Interchange 38) and Garden Avenue (Interchange 41) will have the median lane closed daily between 0600 hours and 1300 hours from Tuesday, May 14, 2013 to Thursday, May 16, 2013 for construction operations.
Waterloo:
Highway 85 (Conestoga Parkway) southbound, at Bridgeport Road, will be reduced from two lanes to a single lane of traffic, Monday, May 13th, 2013, from 2100 hours until 2400 hours, for construction (emergency attenuator repairs work) operations.
Highway 85 (Conestoga Parkway) southbound, from one kilometre north of King Street to University Avenue, will have a rolling closure of a maximum 15 minutes duration, Tuesday, May 14th, 2013 and Wednesday, May 15th, 2013, nightly, from 2200 hours until 0200 hours, for construction (bridge structure work) operations.
St. Thomas:
Highway 3 from Dunnville to Highway 4 Talbotville will have lane closures in both directions on Tuesday, May 14, 2013 from 0900 hours to 1700 hours for a mobile pavement marking operation.
Shelburne:
Highway 89 westbound and eastbound will have alternating lane closures from Shelburne to Mount Forest on Tuesday May 14, 2013, from 1100 hours to 1600 hours for maintenance operations.
Haldimand:
OPP have now reopened Highway 6 at Haldibrook Road.
***ORIGINAL***
Highway 6 at Haldibrook Road, closed in all directions at the intersection due to a collision.